Research

Urban Electric Load Forecasting in China Using Combined Cellular Automata


Reference:

Yongxiu, H., Dezhi, L., Rui, F., Lifang, Y. and Li, F., 2008. Urban Electric Load Forecasting in China Using Combined Cellular Automata. In: 2008 International Workshop on Modelling, Simulation and Optimization, WMSO 2008, 2008-12-27 - 2008-12-28, Hong Kong.

Related documents:

This repository does not currently have the full-text of this item.
You may be able to access a copy if URLs are provided below. (Contact Author)

Official URL:

http://dx.doi.org/10.1109/WMSO.2008.76

Abstract

With the high-speed economic development in China, the transition of structural function in the urban land system highly effects the development of the urban electric load. Forecasting the urban electric load accurately is the foundation of decision making scientifically for the development and planning of the urban power grid in China. This paper improves the decision method of Transition Matrices of Land Use and Cover Change though integrating Cellular Automation with Markov Model firstly. Then, the combined cellular automation model is used to simulate the urban land function evolvement and forecast the land functions in the future as the start point for electric load forecasting. Considering the changes of urban land functions, electric load density, the urban electric load forecasting model is proposed. Finally, the model validation is performed by comparing model predictions with the load data though case study. The results obtained show the accuracy of the adopted methodology for urban load forecasting.

Details

Item Type Conference or Workshop Items (Paper)
CreatorsYongxiu, H., Dezhi, L., Rui, F., Lifang, Y. and Li, F.
DOI10.1109/WMSO.2008.76
DepartmentsFaculty of Engineering & Design > Electronic & Electrical Engineering
RefereedNo
StatusPublished
ID Code13967
Additional InformationID number: doi:10.1109/WMSO.2008.76

Export

Actions (login required)

View Item