Improved cost estimation accuracy through quality improvement techniques
Reference:
Saravi, E., Newnes, L. B., Mileham, A. R. and Cheung, W. M., 2007. Improved cost estimation accuracy through quality improvement techniques. In: Proceedings 5th Internatinonal Conference on Manufacturing Research ICMR2007, 2007-01-01, DeMontfort University.
Related documents:
This repository does not currently have the full-text of this item.You may be able to access a copy if URLs are provided below.
Details
| Item Type | Conference or Workshop Items (Paper) |
| Creators | Saravi, E., Newnes, L. B., Mileham, A. R. and Cheung, W. M. |
| Departments | Faculty of Engineering & Design > Mechanical Engineering |
| Refereed | No |
| Status | Published |
| ID Code | 1504 |
Export
Actions (login required)
| View Item |
