Research

Operational Scheduling Requirements for Multi-Component Flexible Machining Lines


Reference:

England, D. M., Newman, S. T., Rahimifard, S. and Stockton, D. J., 2002. Operational Scheduling Requirements for Multi-Component Flexible Machining Lines. In: Selected Plenary paper for Proceedings of the International Manufacturing Conference, IMC-19,, 2002-08-01, Belfast.

Related documents:

This repository does not currently have the full-text of this item.
You may be able to access a copy if URLs are provided below.

Details

Item Type Conference or Workshop Items (Paper)
CreatorsEngland, D. M., Newman, S. T., Rahimifard, S. and Stockton, D. J.
DepartmentsFaculty of Engineering & Design > Mechanical Engineering
RefereedNo
StatusPublished
ID Code2731

Export

Actions (login required)

View Item