Operational Scheduling Requirements for Multi-Component Flexible Machining Lines
Reference:
England, D. M., Newman, S. T., Rahimifard, S. and Stockton, D. J., 2002. Operational Scheduling Requirements for Multi-Component Flexible Machining Lines. In: Selected Plenary paper for Proceedings of the International Manufacturing Conference, IMC-19,, 2002-08-01, Belfast.
Related documents:
This repository does not currently have the full-text of this item.You may be able to access a copy if URLs are provided below.
Details
| Item Type | Conference or Workshop Items (Paper) |
| Creators | England, D. M., Newman, S. T., Rahimifard, S. and Stockton, D. J. |
| Departments | Faculty of Engineering & Design > Mechanical Engineering |
| Refereed | No |
| Status | Published |
| ID Code | 2731 |
Export
Actions (login required)
| View Item |
