Transmission use of system charges based on trade-offs between short-run operation cost and long-run investment cost


Reference:

Li, Z., Li, F. and Yuan, Y., 2013. Transmission use of system charges based on trade-offs between short-run operation cost and long-run investment cost. IEEE Transactions on Power Systems, 28 (1), pp. 559-561.

Related documents:

This repository does not currently have the full-text of this item.
You may be able to access a copy if URLs are provided below. (Contact Author)

Official URL:

http://dx.doi.org/10.1109/TPWRS.2012.2202200

Related URLs:

Abstract

Previous studies on long-run network charges assume that network reinforcement would be required when the loading level of a circuit reaches its designed capacity. Such assumption works well for a passive distribution network but is not valid for transmission networks as they have active congestion management capabilities. Transmission network operators normally can only justify for network investment when congestion costs exceed network expansion costs. This trade-off between operational cost and investment cost is not considered in any of the existing long-run marginal or incremental cost pricing (LRIC or LRMC).

Details

Item Type Articles
CreatorsLi, Z., Li, F. and Yuan, Y.
DOI10.1109/TPWRS.2012.2202200
Related URLs
URLURL Type
http://www.scopus.com/inward/record.url?scp=84872837860&partnerID=8YFLogxKUNSPECIFIED
DepartmentsFaculty of Engineering & Design > Electronic & Electrical Engineering
Research CentresCentre for Sustainable Power Distribution
RefereedYes
StatusPublished
ID Code34969

Export

Actions (login required)

View Item