Research

Pricing strategy of transmission network wheeling cost considering short-term operational cost


Reference:

Li, Z., Li, F. and Yuan, Y., 2013. Pricing strategy of transmission network wheeling cost considering short-term operational cost. Dianli Zidonghua Shebei/Electric Automation Equipment, 33 (8), pp. 21-28.

Related documents:

This repository does not currently have the full-text of this item.
You may be able to access a copy if URLs are provided below. (Contact Author)

Official URL:

http://dx.doi.org/10.3969/j.issn.1006-6047.2013.08.004

Related URLs:

Abstract

A pricing model based on the long-term incremental cost method is proposed for calculating the wheeling cost of transmission network, which considers the influence of short-term operational cost on the investment time of transmission network components and the wheeling cost of transmission network. To simplify the analysis, the short-term operational cost considered is mainly the congestion management cost. The proposed model is applied respectively to the dual-bus test system and IEEE 30-bus test system, and compared with the traditional pricing model, which verifies its effectiveness.

Details

Item Type Articles
CreatorsLi, Z., Li, F. and Yuan, Y.
DOI10.3969/j.issn.1006-6047.2013.08.004
Related URLs
URLURL Type
http://www.scopus.com/inward/record.url?scp=84885368845&partnerID=8YFLogxKUNSPECIFIED
DepartmentsFaculty of Engineering & Design > Electronic & Electrical Engineering
Research CentresCentre for Sustainable Power Distribution
RefereedYes
StatusPublished
ID Code37736

Export

Actions (login required)

View Item