Research

Items by Mileham, Antony

Up a level
Export as [feed] RSS 1.0 [feed] Atom [feed] RSS 2.0
Group by: Item Type | Date | No Grouping
Number of items: 217.

Book/s

Bramley, A. N., Culley, S. J., Dekoninck, E. A., McMahon, C. A., Medland, A. J., Mileham, A. R., Newnes, L. B. and Owen, G. W., 2004. Proceedings of the IDMME 2004 Conference. Bath: University of Bath. (Proc IDMME (Abstracts and CD))

McIntosh, R. I., Culley, S. J., Mileham, A. R. and Owen, G. W., 2001. Improving Changeover Performance- A strategy for becoming a lean and responsive manufacture. Oxford: Butterworth-Heinemann.

Bramley, A. N., Mileham, A. R., Newnes, L. B. and Owen, G. W., eds., 1999. Advances in manufacturing technology XIII. London: Wiley-Blackwell.

Book Sections

Newnes, L., Mileham, A., Rees, G. and Green, P., 2011. Costing for avionic through-life availability. In: Glocalized Solutions for Sustainability in Manufacturing - Proceedings of the 18th CIRP International Conference on Life Cycle Engineering. New York: Springer Science and Business Media, pp. 675-680. (Glocalized Solutions for Sustainability in Manufacturing - Proceedings of the 18th CIRP International Conference on Life Cycle Engineering)

Saravi, M., Goh, Y.M., Newnes, L. B., Mileham, A. R., Morton, K. and Beedall, D., 2011. Modeling uncertainty in through-life costing at the early design stages-I. In: ASME 2011 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference. Vol. 9. ASME, pp. 1033-1042.

Wang, Q., Mileham, A., Owen, G. and Jacquin, R., 2010. Analysis of matrix assembly systems. In: Jiang, Y. and Wang, L., eds. ICMS2010: Proceedings of the Third International Conference on Modelling and Simulation, Vol 6 - Modelling & Simulation Industrial Engineering & Management. Vol. 6. World Academic Union, pp. 13-18.

Wang, Q., Sowden, M., Mileham, A. and Owen, G., 2010. Modeling human performance using learning curves. In: Jiang, Y. and Bao, H., eds. ICMS2010: Proceedings of the Third International Conference on Modelling and Simulation, Vol 4 - Modelling and Simulation in Biology, Ecology & Environment. Vol. 4. Liverpool: World Academic Union, pp. 1-7.

Wang, Q., McIntosh, R. and Mileham, A., 2010. A RFID-based automated warehouse design. In: ICCET 2010 - 2010 International Conference on Computer Engineering and Technology, Proceedings. Piscataway, NJ: IEEE Computer Society, V6359-V6363.

Wang, Q., McIntosh, R. and Mileham, A., 2010. A novel design of a reconfigurable automated warehouse. In: Huang, G. Q., Mak, K. L. and Maropoulos, P. G., eds. Proceedings of the 6th CIRP-Sponsored International Conference on Digital Enterprise Technology. Vol. 66. Springer-Verlag, pp. 1257-1266. (Advances in Intelligent and Soft Computing)

Cheung, W. M., Mileham, A. R., Newnes, L. B., Marsh, R. and Lanham, J. D., 2010. An extended-enterprise digital data library for through-life cost estimation in innovative product development. In: Huang, G. Q., Mak, K. L. and Maropoulos, P. G., eds. Proceedings of the 6th CIRP-Sponsored International Conference on Digital Enterprise Technology. Vol. 66. Springer-Verlag, pp. 349-360. (Advances in Intelligent and Soft Computing)

Cheung, W., Newnes, L., Mileham, A. R., Marsh, R. and Lanham, J., 2008. Through Life Costing in Electronic Defence Systems: An Integrated Data-Driven Multi-Level Approach. In: Xia, G. P. and Deng, X. Q., eds. Proceedings of the 38th International Conference on Computers and Industrial Engineering. Vol. 1-3. China: Publishing House Electronics Industry, pp. 2119-2128.

Newnes, L. B. and Mileham, A. R., 2006. A proposed method for cost estimating for low volume infrequent electronic products. In: Ghodous, P., DiengKuntz, R. and Loureiro, G., eds. Leading the Web in Concurrent Engineering: Next Generation Concurrent Engineering. Vol. 143. IOS Press, pp. 699-706. (Frontiers in Artificial Intelligence and Applications)

Masuku, E. S., Bramley, A. N., Mileham, A. R. and Owen, G. W., 2005. Incremental sheet metal forming : a die-less rapid prototyping process for sheetmetal. In: Bramley, A. N., Brissaud, D., Coutellier, D. and McMahon, C., eds. Advances in Integrated Design and Manufacturing in Mechanical Engineering. Dordrecht, The Netherlands: Springer, pp. 305-314.

Kirk, C. S., Balogh, A., Beres, L. and Mileham, A. R., 2002. Variability of diffusion coefficients in the analysis of heterogeneous welded joints. In: Proc 3rd Conference on Materials Science and Informantics (Hungary). Uuetikon/Zurich Switzerland: Trans Tech Publications, 122--.

Currie, G. C., Mileham, A. R., Miles, A. W. and Bradford, D. T., 1990. Cost estimation at the conceptual stage of the design process. In: Advances in Manufacturing Technology. Vol. 5. Strathclyde University Prress, pp. 18-22.

Articles

Wang, Q., Sowden, M. and Mileham, A. R., 2013. Modelling human performance within an automotive engine assembly line. The International Journal of Advanced Manufacturing Technology, 68 (1-4), pp. 141-148.

Saravi, M., Newnes, L. B., Mileham, A. R., Goh, Y. M. and Morton, K., 2013. Using Taguchi method to optimise performance and product cost at the conceptual stage of design. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 227 (9), pp. 1360-1372.

Saravi, M., Newnes, L. B. and Mileham, T., 2013. Optimising performance and cost at the early design stages. International Journal of Engineering and Technology Innovation, 3 (3), pp. 214-228.

Mebrahtu, H., Walker, R., Dionysopoulos, T. and Mileham, T., 2009. Manufacturing performance optimization: The simulation-expert mechanism approach. Journal Of Engineering Manufacture - Part B, 223 (12), pp. 1625-1634.

Guo, Y. W., Li, W. D., Mileham, A. R. and Owen, G. W., 2009. Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach. International Journal of Production Research, 47 (14), pp. 3775-3796.

Wang, Q., Lassalle, S., Mileham, A. R. and Owen, G. W., 2009. Analysis of a linear walking worker line using a combination of computer simulation and mathematical modeling approaches. Journal of Manufacturing Systems, 28 (2-3), pp. 64-70.

Maisano, D. A., Jamshidi, J., Franceschini, F., Maropoulos, P. G., Mastrogiacomo, L., Mileham, A. R. and Owen, G. W., 2009. A comparison of two distributed large-volume measurement systems: the mobile spatial co-ordinate measuring system and the indoor global positioning system. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 223 (5), pp. 511-521.

Guo, Y. W., Liu, W. D., Mileham, A. R. and Owen, G. W., 2009. Applications of particle swarm optimisation in integrated process planning and scheduling. Robotics and Computer-Integrated Manufacturing, 25 (2), pp. 280-288.

Cheung, W. M., Marsh, R., Newnes, L. B., Mileham, A. R. and Lanham, J. D., 2009. Standards and inference of design information in through-life costing of innovative defence electronic products. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 223 (2), pp. 169-181.

Sahoo, A. K., Tiwari, M. K. and Mileham, A. R., 2008. Six Sigma based approach to optimize radial forging operation variables. Journal of Materials Processing Technology, 202 (1-3), pp. 125-136.

Newnes, L., Mileham, A., Cheung, W., Lanham, J. D., Saravi, M. E. and Bradbery, R. W., 2008. Predicting the whole-life cost of a product at the conceptual design stage. Journal of Engineering Design, 19 (2), pp. 99-112.

Maisano, D. A., Jamshidi, J., Franceschini, F., Maropoulos, P., Mastrogiacomo, L., Mileham, A. and Owen, G. W., 2008. Indoor GPS: system functionality and initial performance evaluation. International Journal of Manufacturing Research, 3 (3), pp. 335-349.

Wang, Q., Pan, L., Mileham, A. R., Newnes, L. B., Owen, G. W. and Chatwin, C. R., 2007. Modelling Randomness of a manual assembly system with walking workers. International Journal of Industrial and Systems Engineering, 2, 195--210.

Lassalle, S., Wang, Q., Owen, G. W. and Mileham, A. R., 2007. A study in-process waiting time on a linear walking worker assembly line. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 221 (12), pp. 1763-1770.

Wang, Q., Lassalle, S., Mileham, A. R. and Owen, G. W., 2007. Analysis and optimisation of a linear walking worker line using a combination of computer simulation and mathematical modelling approaches. International Journal of Production Research

Guo, Y. W., Mileham, A. R., Owen, G. W. and Li, W. D., 2007. Applications of particle swarm optimisationin integrated process planning and scheduling. International Journal of Robotics and Computer Integrated Manufacturing

Wang, Q., Owen, G. W. and Mileham, A. R., 2007. Determining numbers of workstations and operators for a linear walking-worker assembly line. International Journal of Computer Integrated Manufacturing, 20 (1), pp. 1-10.

Newnes, L. B., Mileham, A. R. and Hosseini-Nasab, H., 2007. On-screen real-time cost estimating. International Journal of Production Research, 45 (7), pp. 1577-1594.

Newnes, L., Mileham, A. and Hosseini-Nasab, H., 2007. Real time cost estimating - A generic approach. International Journal of Advanced Manufacturing Systems, 10 (2), pp. 111-121.

Guo, Y. W., Mileham, A. R., Owen, G. W. and Li, W. D., 2006. Operation sequencing optimization using a particle swarm optimization approach. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 220 (12), pp. 1945-1958.

Reik, M. P., McIntosh, R. I., Culley, S. J., Mileham, A. R. and Owen, G. W., 2006. A formal design for changeover methodology. Part 1: theory and background. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 220 (8), pp. 1225-1235.

Reik, M. P., McIntosh, R. I., Owen, G. W., Culley, S. J. and Mileham, A. R., 2006. A formal design for changeover (DFC) methodology. Part 1 - Theory and background. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 220 (No 8), pp. 1225-1236.

Reik, M. P., McIntosh, R. I., Owen, G. W., Culley, S. J. and Mileham, A. R., 2006. A formal design for changeover (DFC) methodology. Part 2 - Methodology and case study. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 220 (No 8), pp. 1237-1248.

Reik, M. P., McIntosh, R. I., Culley, S. J., Mileham, A. R. and Owen, G. W., 2006. A formal design for changeover methodology. Part 2: Methodology and case study. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 220 (8), pp. 1237-1247.

Jamshidi, J., Owen, G. W. and Mileham, A. R., 2006. A new data fusion method for scanned models. Journal of Computing and Information Science in Engineering, 6 (4), pp. 340-348.

Allwood, J. M., Bramley, A. N., Ridgman, T. W. and Mileham, A. R., 2006. A novel method for the rapid production of inexpensive dies and moulds with surfaces made by incremental sheet forming. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 220 (2), pp. 323-327.

Jamshidi, J., Mileham, A. R. and Owen, G. W., 2006. A proposed data-cloud reduction method forr laser scanned and CMM data integration. Proceedings of the 4th International Conference on Manufacturing Research (ICMR2006)

Liu, W., Butler, R., Mileham, A. R. and Green, A. J., 2006. Bilevel optimization and postbuckling of highly strained composite stiffened panels. AIAA Journal, 44 (11), pp. 2562-2570.

Wang, Q., Pan, L., Mileham, A. R., Owen, G. W., Newnes, L. B. and Chatwin, C. R., 2006. Modelling randomness of a manual assembly system with walking workers. International Journal of Industrial and Systems Engineering, 2 (2), pp. 195-210.

Wang, Q., Owen, G. W. and Mileham, A. R., 2005. Comparison between fixed- and walking-worker assembly lines. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 219 (11), pp. 845-848.

Tiwari, M. K., Prakash, [N. V.], Kumar, A. and Mileham, A. R., 2005. Determination of an optimal assembly sequence using the psychoclonal algorithm. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 219 (1), pp. 137-149.

Mileham, A. R., Morgan, E. J. and Chatting, I., 2004. An attribute management approach to concurrent engineering. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 218 (8), pp. 995-1003.

Busby, J. S., Hibberd, R. E., Mileham, A. R. and Mullineux, G., 2004. Failure modes analysis of organizational artefacts that protect systems. Proceedings of the International Mechanical Engineers, Part B: Journal of Engineering Manufacture, 218, pp. 1211-1216.

Mebrahtu, H., Walker, R. and Mileham, A. R., 2004. Performance enhancement using an expert mechanism in a manufacturing simulator. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 218 (B2), pp. 245-249.

Mileham, A. R., Culley, S. J., Owen, G. W., Newnes, L. B., Giess, M. D. and Bramley, A. N., 2004. The impact of run-up in ensuring rapid changeover. CIRP Annals - Manufacturing Technology, 53 (1), pp. 407-410.

Culley, S. J., Owen, G. W., Mileham, A. R. and McIntosh, R. I., 2003. Sustaining changeover improvement. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 217 (10), pp. 1455-1470.

Kirk, C. S., Balogh, A., Beres, L. and Mileham, A. R., 2003. Variability of diffusion coefficients in the analysis of heterogeneous welded joints. Eco-Materials Processing & Design Vii, 414-415(2003), pp. 431-438.

Masuku, E. S., Mileham, A. R., Hardisty, H., Bramley, A. N., Johal, C. and Detassis, P., 2002. A finite element simulation of the electroplating process. CIRP Annals - Manufacturing Technology, 51 (1), pp. 169-172.

Kirk, C. S., Bodamyali, T., Stevens, C. R. and Mileham, A. R., 2002. Computer modelling and experimental validation of smooth muscle cell growth using matrigel as a basement membrane matrix. European Cells and Materials, IV (Supplement 2), 15-Abstracts of TCES 2002.

Kirk, C. S., Horrocks, M., Mileham, A. R. and Chaudhuri, J. B., 2002. Modelling and simulation of vascular tissue engineering using the finite volume method. European Cells and Materials, IV (Supplement 2), 141-Abstracts of TCES 2002.

Kirk, C. S. and Mileham, A. R., 2002. Modelling oxygen availability in blood serum perfleurocarbons and aqueous based medium. European Cells and Materials, IV (Supplement 2), 110-Abstracts of TCES 2002.

Newnes, L. B., Mileham, A. R. and Doniavi, A., 2001. A systems approach to electronic assembly optimization. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 215 (10), pp. 1409-1415.

Newnes, L. B., Mileham, A. R. and Doniavi, A., 2001. A systems approach to semiconductor optimisation. IEEE Transactions on Electronic Packaging Manufacturing, 24 (3), pp. 171-177.

Kirk, C. S., Balogh, A., Beres, L. and Mileham, A. R., 2001. Application of the finite volume method to prediction of failure zones in creep resistant steels. GEP (Journal of the Hungarian Institute of Mechanical Engineers), 3-4 (LII.evfolyam), pp. 13-16.

McIntosh, R. I., Culley, S. J., Mileham, A. R. and Owen, G. W., 2001. Changeover improvement: A maintenance perspective. International Journal of Production Economics, 73 (2), pp. 153-163.

Doniavi, A., Mileham, A. R. and Newnes, L. B., 2000. A systems approach to photolithography process optimization in an electronics manufacturing environment. International Journal of Production Research, 38 (11), pp. 2515-2528.

Conference or Workshop Items

Muelaner, J. E., Wang, Z., Jamshidi, J., Maropoulos, P., Mileham, A. R., Hughes, E. B. and Forbes, A. B., 2008. iGPS - An Initial Assessment Of Technical And Deployment Capability. In: 3rd International Conference on Manufacturing Engineering, 2008-10-01 - 2008-10-03, Kallithea of Chalkidiki.

Guo, Y., Owen, G., Liu, W., Maropoulos, P. and Mileham, A., 2008. Application of Particle Swarm Optimisation Approach to Integrate Process Planning and Scheduling. In: Proceedings of 5th International Conference on Digital Enterprise Technology, 2008-10-22 - 2008-10-24, Nantes.

Wang, Z., Maropoulos, P., Jamshidi, J., Owen, G. and Mileham, A., 2008. Experimental Deployment of the Indoor GPS Large Volume Metrology System in a Large Scale Production Facility. In: 3rd International Conference on Manufacturing Engineering, 2008-10-01 - 2008-10-03, Kallithea of Chalkidiki.

Wang, Q., Manickam, H., Mileham, A. and Owen, G., 2008. An investigation of a semi-automated automotive engine assembly line incorporating walking workers. In: 2nd CIRP Conference on Assembly Technologies and Systems, 2008-09-21 - 2008-09-23, Toronto.

Saravi, M., Newnes, L., Mileham, A. and Goh, Y.-M., 2008. Estimating Cost at the Conceptual Design Stage to Optimize Design in terms of Performance and Cost. In: Proceedings of the 15th ISPE Int Conf on Concurrent Engineering (CE2008), 2008-08-18 - 2008-08-22, Queens Belfast.

Wasiak, J., Newnes, L., Mileham, T., Hicks, B. and Outram, G., 2008. Guiding team selection and the use of the Belbin approach. In: 10th International Design Conference, Design 2008, 2008-05-19 - 2008-05-22, Dubrovnik.

Bradbery, R., Newnes, L. B. and Mileham, A. R., 2007. Estimation of non-recurring costs in manufacturing. In: Advances in Manufacturing Technology XXI, 2007-09-01, DeMontfort University.

Guo, Y., Mileham, A., Owen, G. and Maropoulos, P., 2007. Operation Sequencing Optimisation Using a Particle Swarm Optimisation Approach for 5 Axis Prismatic Part. In: 4th International Conference on Digital Enterprise Technology, 2007-09-19 - 2007-09-21, Bath.

Jamshidi, J., Owen, G., Maropoulos, P. and Mileham, A., 2007. Reverse Engineering of a Mechanical Component - A Case Study of F1 Student Car. In: 4th International Conference on Digital Enterprise Technology, 2007-09-19 - 2007-09-21, Bath.

Wang, Q., Lassalle, S., Mileham, A. R. and Owen, G. W., 2007. A changeable reconfigurable and agile assembly system using walking workers. In: Proceedings of IASTED Asian Conf on Modelling and Simulation, 2007-01-01, Beijing.

Maisano, D. A., Jamshidi, J., Franceschini, F., Maropoulos, P. G., Mastrogiacomo, L. A., Mileham, A. R. and Owen, G. W., 2007. A review of two multistation large volume measuring instruments: MScMS AND iGPS. In: 4th International Conference on Digital Enterprise Technology, 2007-09-19 - 2007-09-21, Bath.

Cheung, W. M., Newnes, L. B., Mileham, A. R., Marsh, R. and Lanham, J. D., 2007. A study of life cycle costing in the perspectives of research and commercial applications in the 21st centuary. In: Proceedings of ASME 2007 International Design Engineering and Technical Conference and Computers and Information in Engineering Conference IDETC?CIE, 2007-01-01, Las Vegas.

Cheung, W. M., Newnes, L. B., Mileham, A. R., Marsh, R. and Lanham, J. D., 2007. Cost estimation in product development: academic research and commercial systems evaluation. In: Proceedings of DET2007 4th International Conference on Digital Enterprise Technology, 2007-09-19 - 2007-09-21, University of Bath.

Saravi, E., Newnes, L. B., Mileham, A. R. and Cheung, W. M., 2007. Improved cost estimation accuracy through quality improvement techniques. In: Proceedings 5th Internatinonal Conference on Manufacturing Research ICMR2007, 2007-01-01, DeMontfort University.

Mileham, A., 2007. Integrating product and manufacturing systems design to minimise changeover losses. In: ICED 07, 2007-01-01, Paris.

Marsh, R., Cheung, W. M., Lanham, J. D., Newnes, L. B. and Mileham, A. R., 2007. Modelling an assembly process using a close coupled generative cost model and a discrete event simulation. In: 4th International CIRP-Sponsored Conference (DET2007), 2007-09-19 - 2007-09-21, University of Bath.

Owen, G. W., Culley, S. J., Reik, M., McIntosh, R. I. and Mileham, A. R., 2007. Using differing classification methodologies to identify a full compliment of potential changeover improvement opportunities. In: Proc 14th ISPE Conf on Concurrent Engineering CE2007 (Complex Systems Concurrent Engineering, 2007-01-01, Sao-Paulo Brazil.

Jamshidi, J., Owen, G. W., Maropoulos, P. G. and Mileham, A. R., 2007. Variable volume metrology with multiple scale scanners. In: Proc 2nd International Conference on Changeable, Agile, Reconfigurable and Virtual Production (CARV2007), 2007-01-01, Toronto Canada.

Wang, Q., Liow, D. C. Y., Pan, L., Mileham, A. R., Owen, G. W. and Shin, I. J., 2006. Modelling and simulation of human performance within a walking worker assembly line. In: Proc 1st CIRP International Seminar on Assembly Systems, 2006-11-01, Germany.

Frobisher, P., Dekoninck, E. A. and Mileham, A. R., 2006. Improving manufacturing and process innovation at an automotive component manufacturer. In: Proc 6th International Conference on Indegrated Design and Manufacturing in Mechanical Engineering (IDMME2006), 2006-05-01, University of Grenoble.

Jamshidi, J., Mileham, A. R. and Owen, G. W., 2006. A CAD modelling system Automation for Reverse Engineering Applications. In: Cunha, P. F. and Maropoulos, P. G., eds. Digital Enterprise Technology, 2006-01-01, Setubal Portugal.

Eriksson, K. M., Mileham, A. R. and Newnes, L. B., 2006. A novel scheduling performance comparison tool - scheduling performance profile (spp) graph. In: Proc 6th International Conference on Indegrated Design and Manufacturing in Mechanical Engineering (IDMME2006), 2006-05-01, University of Grenoble.

Newnes, L. B. and Mileham, A. R., 2006. A proposed method for cost estimating for low volume electronic products. In: Proc 13th International Conference on Concurrent Engineering - Next Generation Concurrenr Engineering (CE2006), 2006-01-01, Antibes.

Wang, Q., Mileham, A. R., Owen, G. W. and Chatwin, C. R., 2006. An integrated investigation into a communication network for a PCBA system. In: Proc IEEE International Conference on Robotics and Biomimetics, 2006-01-01, Kunming PRC.

Reik, M. P., Mileham, A. R., Culley, S. J., McIntosh, R. I. and Owen, G. W., 2006. Design for Changeover (DFC); Integrated product and process design for mass-customized, flexible manufacture. In: Proc 2006 International Forum on DFMA, 2006-01-01, RI USA.

Jamshidi, J., Mileham, A. R. and Owen, G. W., 2006. Dimensional tolerance approximations for reverse engineering applications. In: Proc 9th International Design Conference (Design 2006), 2006-01-01, University of Dubrovnik.

Jamshidi, J., Mileham, A. R. and Owen, G. W., 2006. High accuracy laser scanned view registration method for reverse engineering using a CMM generated CAD model. In: Proc International ASME Design Engineering Technical Conference & Computers and Information in Engineering Conference (IDETC/CIE2006), 2006-01-01, Philadelphia USA.

Jamshidi, J., Mileham, A. R. and Owen, G. W., 2006. Rapid and accurate data integration method for Reverse Engineering Applications. In: Proc 6th International Conference on Indegrated Design and Manufacturing in Mechanical Engineering (IDMME2006), 2006-05-01, University of Grenoble.

Jamshidi, J., Mileham, A. R. and Owen, G. W., 2005. A laser scanning registration technique for reverse engineering applications. In: Proc 3rd International Conference on Manufacturing Research (ICMR2005), 2005-09-01, Cranfield University.

Liu, W., Butler, R. and Mileham, A. R., 2005. Optimum design, experimental testing and post-buckling analysis of thick composite stiffened panels. In: 46th AIAA/ASME/ASCE/AHS/ASC Structures, Structural Dynamics & Materials Conference, 2005-04-01, Austin, Texas.

Eriksson, K. M., Mileham, A. R. and Newnes, L. B., 2005. A study of short- medium- and long-horizon final production scheduling, applying priority rules and using a discrete event simulation approach. In: Proc 3rd International Conference on Manufacturing Research (ICMR2005), 2005-09-01, Cranfield University.

Wang, Q., Owen, G. W. and Mileham, A. R., 2005. Assessing the effect of work time variations for a linear walking-fitter assembly line. In: Proc 3rd International Conference on Manufacturing Research (ICMR2005), 2005-09-01, Cranfield University.

Reik, M. P., McIntosh, R. I., Owen, G. W., Mileham, A. R. and Culley, S. J., 2005. Design for changeover: enabling the design of highly flexible, highly responsive manufacturing processes. In: Proc of the International Mass Customisation Meeting 2005 (IMCM05), 2005-01-01, Klagenfurt.

Qin, Q., Masuku, E. S., Bramley, A. N., Mileham, A. R. and Owen, G. W., 2005. Incremental sheet-metal forming simulation and accuracy. In: Proc ICTP 2005, 2005-01-01, Verona.

Jeon, A. H. J., Low, J., Mileham, A. R., Bramley, A. N. and Johal, C., 2005. Simulating electroplated micro surfaces in 3-D process. In: Proceedings of the 1st International Conference on Multi-Material Micro Manufacture (4M2005), 2005-01-01, Karlsruhe.

Reik, M. P., McIntosh, R. I., Owen, G. W., Mileham, A. R. and Culley, S. J., 2005. The development of a systematic design for changeover methodology (205.44). In: Proc 15th ICED05, 2005-01-01, Melbourne.

Frobisher, P., Dekoninck, E. A., Mileham, A. R. and Vincent, J. F. V., 2004. Improving Innovation using TRIZ. In: proceedings of TRIZ future Conference 2004, 2004-11-01, Florence.

Mebrahtu, H., Walker, R. and Mileham, A. R., 2004. Knowledge-based optimisation in a manufacturing simulator. In: Proc 21st Internation Manufacturing Conference (IMC21), 2004-09-01, Ireland.

Reik, M. P., Culley, S. J., Owen, G. W., Mileham, A. R. and McIntosh, R. I., 2004. A novel product performance driven catergorisation of DFX methodologies. In: Proc 2ndInternational Conference on Manufacturing Research (ICMR2004), 2004-01-01, Sheffield Hallam University.

Mebrahtu, H., Walker, R. and Mileham, A. R., 2004. Automating Part of the model verification process. In: Proc 2nd Industrial Simulation Conference (ISC2004), 2004-01-01, University of Malaga.

Lacarac, V., Smith, D., Tierney, M., Chang, C. C., Bramley, A. N., McMahon, C., Culley, S. J., Dekoninck, E. A., Medland, A. J., Mileham, A. R., Newnes, L. B. and Owen, G. W., 2004. Creation of residual stresses during forging and heat treatment. In: 5th International Conference on Integrated Design and Manufacturing in Mechanical Engineering, 2004-04-01.

Culley, S. J., Mileham, A. R., Owen, G. W. and McIntosh, R. I., 2004. Design for changeover and sustainability. In: International Forum on DFMA: "Cost effective design solutions for product lifecycle management", 2004-06-22 - 2004-06-23, Newport, RI.

Masuku, E. S., Bramley, A. N., Mileham, A. R. and Owen, G. W., 2004. Incremental sheetmetal forming : a die-less rapid prototyping process for sheetmetal. In: Proc IDMME2004 and Advances in Integrated Design and Manufacture in Mechanical Engineering, 2004-01-01, University of Bath.

Hall, G., Mileham, A. R., Cockayne, D. and Davies, S., 2003. The design and implementation a computer integrated manufacturing and business system for remote working. In: Proc 1st National Conference on Manufacturing Research ICMR2003 - Advances in Manufacturing ResearchXVII, 2003-09-01, University of Strathclyde.

Mebrahtu, H., Walker, R. and Mileham, A. R., 2003. Performance enhancement using an expert mechanism in a manufacturing simulator. In: Proc 1st Industrial Simulation Conference (ICS 2003), 2003-06-01, University Politecnica De Valencia.

Eriksson, K. M., Newnes, L. B. and Mileham, A. R., 2003. A survey investigating current industrial scheduling practice among a cross-section of UK companies. In: Proc 1st National Conference on Manufacturing Research ICMR2003 - Advances in Manufacturing ResearchXVII, 2003-09-01, University of Strathclyde.

Hosseini-Nasab, H., Newnes, L. B. and Mileham, A. R., 2003. Automatic on-screen cost estimation for the conceptual stage of design. In: Proc 1st National Conference on Manufacturing Research ICMR2003 - Advances in Manufacturing ResearchXVII, 2003-09-01, University of Strathclyde.

Fitton, S., Mileham, A. R. and Owen, G. R., 2003. The design of flexible assembly lines. In: Proc 1st National Conference on Manufacturing Research ICMR2003 - Advances in Manufacturing ResearchXVII, 2003-09-01, University of Strathclyde.

Culley, S. J., Mileham, A. R., Evatt, M. A. C. and Broadhurst, E. K., 2002. The integration of design and business issues in the engineering curriculum.

Masuku, E. S., Mileham, A. R., Hardisty, H., Bramley, A. N., Johal, C. and Detassis, P., 2002. A finite element modelling of the electroplating process. In: Proc 5th International Conference on Manufacturing Processes,Systems and Operations Management in Less Industrialised Regions, 2002-01-01, NUST (National University of Science and Technology), Bulawayo.

Mileham, A. R., Hardisty, H., Bramley, A. N., Masuku, E. S., Johal, C. and Detassis, P., 2002. A finite element simulation of the electroplating process. In: Proc 18th ISPE/IFAC International Conference on CADCAM Robotics and Factories of the Future (CARS&FOF2002), 2002-01-01, Porto.

Masuku, E. S. and Mileham, A. R., 2002. Intelligent CAD mould design for injection moulding. In: Proc 5th International Conference on Manufacturing Processes,Systems and Operations Management in Less Industrialised Regions, 2002-01-01, NUST (National University of Science and Technology), Bulawayo.

Kirk, C. S., Horrocks, M., Mileham, A. R. and Chaudhuri, J. B., 2002. Modelling and simulation of vascular tissue engineering using the finite volume method. In: MicroCAD2002 International Computer Science Conference, 2002-01-01, University of Miskolc.

Mileham, A. R., Hardisty, H., Bramley, A. N., Masuku, E. S., Johal, C. and Detassis, P., 2002. Modelling the electroplating process. In: Proc EAST-Forum2002, 2002-01-01, FEM, Schwabisch Gmud.

Eldridge, C., Mileham, A. R., McIntosh, R. I., Culley, S. J., Owen, G. W. and Newnes, L. B., 2002. Rapid changeovers - the run up problem. In: Conference on CADCAM Robotics and Factories of the Future (CARS&FOF2002), 2002-01-01, Porto. INESC Porto (Manufacturing Systems Dept) Portugal.

Mileham, A. R., Culley, S. J., McIntosh, R. I. and Owen, G. W., 2002. The development of a design for changeover methodology. In: International Forum on DFMA, 2002-01-01, Newport, RI.

Lee, J. R., Mileham, A. R. and Owen, G. W., 2001. Development of principles for ergonomic arena seating design. In: Proc 17th National Conference on Manufacturing Research - Advances in Manufacturing Technology XV, 2001-01-01, University of Cardiff.

Eldridge, C., Mileham, A. R., Culley, S. J., Owen, G. W. and Newnes, L. B., 2001. Run up: the hidden cost of changeover. In: IMechE seminar on Rapid Changeovers of Food Production Lines, 2001-01-01.

McIntosh, R. I., Mileham, A. R., Culley, S. J. and Owen, G. W., 2001. Sustaining improvements in changeover performance. In: IMechE seminar on Rapid Changeovers of Food Production Lines, 2001-01-01.

Allen, N. G., Mileham, A. R. and Jeffries, A. W., 2001. The introduction of assembly cells to the clean room of a medical device manufacturer. In: Proc 4th International SMESME Conference, 2001-01-01, Aalborg University.

Daniel, J. A., Wills, S. P., Darling, J., Mileham, A. R. and Owen, G. W., 2000. Design for assembly in the caravan industry - A case study. In: 16th International Conference on Manufacturing Research, 2000-10-01, University of East London.

Jeffries, A. W., Mileham, A. R. and Jopling, R. D., 2000. Manufacturing change control through teamwork - a case study. In: Proc 33rd CIRP International Seminar on Manufacturing Systems, 2000-06-01, Stockholm.

McIntosh, R. I., Gest, G. B., Culley, S. J. and Mileham, A. R., 2000. Achieving and optimising flexible manufacturing performance on existing manufacturing systems. In: Proc 4th International Factory 2000 Conference, 2000-01-01, University of York.

Gest, G. B., Culley, S. J., McIntosh, R. I., Mileham, A. R. and Owen, G. W., 2000. Classification methodologies for set-up-reduction techniques within industry. In: Proc 4th International Factory 2000 Conference, 2000-01-01, University of York.

Hosseini-Nasab, H., Newnes, L. B. and Mileham, A. R., 2000. Computer cost estimation at the concept design stage. In: Proc 16th International Conference on Manufacturing Research - Advances in Manufacturing TechnologyXIV, 2000-01-01, University of East London.

Shirvani, H., Hardisty, H. and Mileham, A. R., 2000. Finite element moving boundary technique for automatic design of ECM tooling. In: Proc 27th International Symposium on Industrial Robots - Robotics Towards 2000 (SIRI), 2000-01-01, Milan Italy.

Kirk, C. S., Tisza, M., Balogh, A. and Mileham, A. R., 2000. Modelling moving surface boundaries in multi-phase, visco-plastic and elasto-plastic flows using a novel polymorphic cell. In: Proc International Computer Science Conference MicroCAD 2000, 2000-01-01, Hungary.

Newnes, L. B., Mileham, A. R. and Doniavi, A., 2000. Ten stages to optimising electronic manufacturing. In: Proc International Computer Aided Engineering Conference CAPE2000, 2000-01-01, Edinburgh.

Mileham, A. R., Jeffries, A. W., Owen, G. W. and Pellegrin, F., 2000. The design and performance of walking fitter assembly lines. In: Proc 16th International Conference on CADCAM Robotics and Factories of the Future (CARS&FOF2000), 2000-01-01, University of the West Indies, Trinidad.

Mileham, A. R., Hardisty, H. and Clifton, D. A., 2000. The effect of electrolyte flow in electromechanical machining. In: Proc 16th International Conference on CADCAM Robotics and Factories of the Future (CARS&FOF2000), 2000-01-01, University of the West Indies, Trinidad.

Mileham, A. R., Owen, G. W. and Jeffries, A. W., 2000. The introduction of advanced technology into a micro-company - a case study. In: Fox, T. B. and Steeple, D., eds. Proc 3rd International SMESME Conference, 2000-01-01, Coventry.

Jeffries, A. W. and Mileham, A. R., 1999. The implementation of an assembly line - a case study. In: Advances in manufacturing technology XIII - Proc 15th National Conference on Manufacturing Research, 1999-09-01, University of Bath.

Kwon, H. H., Bramley, A. N., Mileham, A. R., Newnes, L. B. and Owen, G. W., 1999. Die design for the cold forging of spur gears. In: Advances in Manufacturing Technology XIII, Proceedings of the 15th National Conference on Manufacturing Research, 1999-01-01, Bury St Edmunds, Suffolk.

Chang, C. C., Bramley, A. N., Mileham, A. R., Newnes, L. B. and Owen, G. W., 1999. Forging preform design using reverse simulation for plain strain application. In: Bramley, A. N., Mileham, A. R., Newnes, L. B. and Owen, G. W., eds. Advances in Manufacturing Technology XIII, Proceedings of the 15th National Conference on Manufacturing Research, 1999-01-01, Bury St Edmunds, Suffolk.

Crookes, J. M., Mynors, D. J., Bramley, A. N., Garner, D. G., Hankers, J. B., Haseldine, J., Delday, T. D., Mileham, A. R., Newnes, L. B. and Owen, G. W., 1999. Moving to right first time through the application of forging simulation - an industrial case study. In: Mileham, A. R., Newnes, L. B. and Owen, G. W., eds. Advances in Manufacturing Technology XIII, Proceedings of the 15th National Conference on Manufacturing Research, 1999-01-01, Bury St Edmunds, Suffolk.

Doniavi, A., Mileham, A. R. and Newnes, L. B., 1999. Optimising electronic manufacturing processes. In: Proc 24th International Electronics Manufacturing Technology Symposium (1999IEMTSymp), 1999-01-01, Austin, Texas.

Balogh, A., Beres, L., Kirk, C. S. and Mileham, A. R., 1999. Predicting the austenite grain size and homogeneity using continuous heat flow equations. In: Proc MicroCAD99 International Computer Science Conference, 1999-01-01, Miskolc Hungary.

Bellicoso, S. and Mileham, A. R., 1999. The economics and machining of 316L stainless steel using modern drills and insert tooling - a case study. In: Advances in manufacturing technology XIII - Proc 15th National Conference on Manufacturing Research, 1999-09-01, University of Bath.

Mileham, A. R., Culley, S. J., Owen, G. W. and McIntosh, R. I., 1998. Rapid changeovers - a pre-requisite to manufacturing responsiveness. In: Proc IEE Workshop on Responsiveness in Manufacture, 1998-02-23, Savoy Place London.

Kirk, C. S., Balogh, A., Komblodi, A. and Mileham, A. R., 1998. Improvements in CAD/CAM through modelling the weld thermla cycle. In: Proc International Computer Science Conference MicroCAD 1998, 1998-01-01, Hungary.

Doniavi, A., Mileham, A. R. and Newnes, L. B., 1997. Computer integrated systems modelling in electronics industrial engineering. In: Proc 10th ADM Conference - International Conference on Design Tools and Methods in Industrial Engineering, 1997-09-01, Italy.

Doniavi, A., Mileham, A. R. and Newnes, L. B., 1997. Systems modelling methodologies in the manufacturing environment. In: 15th IMACS World Congress on Scientific Computation, Modelling and Applied Mathematics, 1997-08-01, Berlin.

Mileham, A. R., Hardisty, H., Shirvani, H. and Clifton, D. A., 1997. Simulating the electrochemical machining (ECM) process - a die design aid. In: Proc International Conference on Design and Production of Dies and Moulds, 1997-06-19, Istanbul.

Culley, S. J., Mileham, A. R., Owen, G. W., McIntosh, R. I. and Gest, G. B., 1997. Rapid changeover of dies and molds. In: Proc. Int. Conf. on the Design & Production of Dies & Molds, 1997-06-01, Istanbul.

Shirvani, H., Mileham, A. R. and Hardisty, H., 1997. A finite element moving boundary technique for modelling the electrochemical machining process. In: Proc 2nd International Conference onthe Application of Numerical Methods in Engineering, 1997-01-01, Malaysia.

Doniavi, A., Mileham, A. R. and Newnes, L. B., 1997. Computer integrated systems engineering in an electronics manufacturing environment. In: Advances in manufacturing technology XIII - Proc 13th National Conference on Manufacturing Research, 1997-01-01, Glasgow.

Mileham, A. R., Hardisty, H., Shirvani, H. and Clifton, A. D., 1997. Integrating tool design and manufacture for electrochemical machining (ECM) using process simulation. In: Proc 10th ADM Conference - International Conference on Design Tools and Methods in Industrial Engineering, 1997-09-01, Italy.

Masuku, E. S. and Mileham, A. R., 1997. Process based heurisitcs for automated mould design for injection moulding. In: Advances in manufacturing technology XIII - Proc 13th National Conference on Manufacturing Research, 1997-01-01, Glasgow.

Masuku, E. S. and Mileham, A. R., 1997. Product based heuristics for automated mould design for injection moulding. In: Proc International Conference on Advances in Materials and Processing Technology (AMPT97), 1997-01-01, Portugal.

Kirk, C. S., Shirvani, H., Rees, D. A. S. and Mileham, A. R., 1996. Mathematical prediction of the weld thermal cycle and HAZ microstructure. In: Proc 2nd International Conference on Coasts, Ports and Marine Structures, 1996-12-01, Iran.

Masuku, E. S. and Mileham, A. R., 1996. Expert rules in mould design for injection moulding. In: Proc 12th National Conference on Manufacturing Research - Advances in Manufacturing Technology X, 1996-09-01, Bath.

Culley, S. J. and Mileham, A. R., 1996. Changeover strategies for agile manufacture. In: Proc of the 3rd International Conference of the European Operations, 1996-06-01.

Mileham, A. R., 1996. Linking design & manufacture through process planning (Invited Seminar).

Kirk, C. S. and Mileham, A. R., 1996. An evaluation of flux cored wire metal-arc welding and its effect on cost of production. In: Proc 2nd International Conference on Manufacturing Processes, Systems & Operatings Management in Less Industrial Regions, 1996-04-01, Bulawayo.

Kirk, C. S. and Mileham, A. R., 1996. The significance of electrode extension on critical cooling rates and the heat affected zone. In: Proc 2nd International Conference on Manufacturing Processes, Systems & Operatings Management in Less Industrial Regions, 1996-04-01, Bulawayo.

Hardisty, H., Shirvani, H. and Mileham, A. R., 1996. A 2-D model of the electrochemical machining process. In: Proc 12th ISPE/IFAC International Conference on CADCAM Robotics and Factories of the Future (CARS&FOF96)., 1996-01-01.

Doniavi, A., Mileham, A. R. and Newnes, L. B., 1996. A systems approach to modelling in the manufacturing environment. In: Proc 12th National Conference on Manufacturing Research - Advances in Manufacturing Technology X, 1996-09-01, Bath.

Linardakis, S. and Mileham, A. R., 1995. A methodology for identifying features for prismatic components from CAD files. In: Proc 11th National Conference on Manufacturing Research - Advances in Manufacturing Technology iX, 1995-09-01, DeMontfort University.

Fernihough, M., Mileham, A. R. and Culley, S. J., 1995. A multi-level technique for the modelling and evaluation of business strategies. In: Proc 11th National Conference on Manufacturing Research - Advances in Manufacturing Technology iX, 1995-09-01, DeMontfort University.

Mileham, A. R., Culley, S. J., Owen, G. W. and McIntosh, R. I., 1995. Design for changeover - a pre-requisite for lean manufacture. In: Proc 28th International Symposium of the Automotive Technology and Automation (ISATA) on Lean/Agile Manufacturing in the Automotive Industries, 1995-09-01, Stuttgart.

Ford, J., Gillespie, P., Mileham, A. R., Newnes, L. B. and Jeffries, A. W., 1995. Measuring supplier performance in a JIT environment. In: Proc 11th National Conference on Manufacturing Research - Advances in Manufacturing Technology iX, 1995-09-01, DeMontfort University.

Culley, S. J., Mileham, A. R., Own, G. W., MacIntosh, R. I., Gest, G. B. and Shirvani, B., 1995. Design for change over - products, machines, and tooling systems. In: Shirvani, B., ed. 3rd International Conference on Sheet metal, 1995-06-01, Univ. Central England.

McIntosh, R., Culley, S. J., Gest, G. B., Mileham, A. R. and Owen, G. W., 1995. The role of rapid changeover in adapting manufacturing systems for Lean Manufacture. In: Proc 5th International European Automobile EngineersC-operation Congress (EAEC) -Lean product Development and Manufacture, 1995-05-01, Strasbourg.

Mileham, A. R., Hardisty, H. and Shirvani, H., 1995. A 2-D simulation of the electrochemical machining process. In: Proc International Conference on Advanced Manufacturing (ICAM95), 1995-01-01, Sunderland.

Mileham, A. R., Hardisty, H. and Shirvani, H., 1995. A 2-D thermal model of the electrochemical machining process. In: Proc IX International Conference on Numerical Methods in Thermal Problems, 1995-01-01, Atlanta.

Linardakis, S. and Mileham, A. R., 1995. A methodology for extracting manufacturing features for prismatic components from CAD, DXF files. In: Proc 12 International Conference of the Irish Manufacturing Committee (IMC12 - Competitive Manufacturing), 1995-01-01.

Owen, G. W., McIntosh, R. I., Mileham, A. R., Culley, S. J. and Gest, G., 1995. Manufacturing flexibility - A case for excess capacity. In: Proc 11th National Conference on Manufacturing Research - Advances in Manufacturing Technology iX, 1995-09-01, DeMontfort University.

Greville, N., Culley, S. J. and Mileham, A. R., 1995. Set-up reduction within the flexographic industry - A Case Study. In: Proc 11th National Conference on Manufacturing Research - Advances in Manufacturing Technology iX, 1995-09-01, DeMontfort University.

Fernihough, A. M., Owen, G. W., Mileham, A. R. and Culley, S. J., 1995. The development of a technique for the evaluation of business strategies. In: Proc Concurrent EngineeringConference (CE95), 1995-01-01, Virginia USA.

Kirk, C. S., Mileham, A. R. and Yeo, R. B. G., 1995. The role of wire resistivity in semi-automatic welding quality. In: Proc 3rd International Conference on Sheet Metal (SHEEMET95), 1995-01-01, Birmingham.

Kirk, C. S., Mileham, A. R. and Yeo, R. B., 1995. The role of wire resistivity in semi-automatic welding quality : Pt 1. In: Proc 11th National Conference on Manufacturing Research - Advances in Manufacturing Technology iX, 1995-09-01, DeMontfort University.

Gest, G. B., Culley, S. J., McIntosh, R. I. and Mileham, A. R., 1994. An implementation level approach for the identification of set-up reduction techniques. In: Proc 10th National Conference on Manufacturing Research - Advances in Manufacturing Technology IIX, 1994-09-01, Loughborough Universit.

McIntosh, R. I., Culley, S. J., Gest, G. B. and Mileham, A. R., 1994. Design rules for rapid changeover. In: Proc 10th National Conference on Manufacturing Research - Advances in Manufacturing Technology IIX, 1994-09-01, Loughborough Universit.

Mileham, A. R. and Culley, S. J., 1994. The design of fast tool change systems. In: Proc Design and Integrated Production Group/EPSRC Research Conference, 1994-09-01, Warwick University.

Mileham, A. R., Hardisty, H. and Shirvani, H., 1994. Electrochemical machining user computer simulation. In: Proc 10th International IPE/IFAC Conference on CAD/CAM Robotics and Factories of the Future (CARS&FOF), 1994-08-01, Ottawa.

Fernihough, A. M., Culley, S. J. and Mileham, A. R., 1994. A financial model for set-up-reduction (SUR) justification. In: Proc 4th International Flexible Automation & Information Management Conference (FAIM94), 1994-01-01, Virginia USA.

Scott, A. J. and Mileham, A. R., 1994. A new system to nest sheet metal parts in the low volume, high variety environment. In: Proc 1st International Conference on Manufacturing Processes Systems and Operations Management in Less Industerialised Regions, 1994-01-01, Bulawayo Zimbabwe.

Scott, A. J. and Mileham, A. R., 1994. A new system to nest sheet metal parts which have been enclosed within rectangular envelopes. In: Proc 2nd International Conference on Sheet Metal (SHEMET94), 1994-01-01, N.Ireland.

Mileham, A. R. and Currie, G. C., 1994. A parametric approach to cost estimating at the conceptual stage of design. In: A parametric approach to cost estimating at the conceptual stage of design, 1994-01-01, University of Bath.

Linardakis, S. and Mileham, A. R., 1994. A strategy for extracting features for prismatic components from CAD DXF files. In: Proc 10th National Conference on Manufacturing Research - Advances in Manufacturing Technology IIX, 1994-09-01, Loughborough Universit.

Kirk, C. S. and Mileham, A. R., 1994. Gas shielded metal arc welding improving quality by minimisation of defects. In: Proc 10th National Conference on Manufacturing Research - Advances in Manufacturing Technology IIX, 1994-09-01, Loughborough Universit.

Mileham, A. R., 1994. The use of group projects for the integration of design manufacturing and marketing. In: 2nd International Symposium in Engineering Education - Product Development in Engineering Education, 1994-10-01, University of Limerick.

Mileham, A. R., 1993. Simulation in manufacturing Invited Seminar.

Owen, G. R. and Mileham, A. R., 1993. A method for buffering transfer lines to maximise output. In: Proc 10th Conference of the Irish Manufacturing Committee, 1993-09-01, University College Galway.

Scott, A. J. and Mileham, A. R., 1993. Automated nesting of sheet metal components onto stock sheets. In: Bramley, A. N. and Mileham, A. R., eds. Proc 9th National Conference on Manufacturing Research - Advances in Manufacturing Technology VII, 1993-09-01, Bath.

Culley, S. J., Gest, G. B., McIntosh, R. I., Mileham, A. R. and Bramley, A. .N., 1993. Classifying and selecting set-up reduction techniques. In: Proc.9th NCMR, Advances in Man.Tech.VII, 1993-09-01, University of Bath.

Linardakis, S. and Mileham, A. R., 1993. Manufacturing feature identification for prismatic components from CAD, DXF files. In: Bramley, A. N. and Mileham, A. R., eds. Proc 9th National Conference on Manufacturing Research - Advances in Manufacturing Technology VII, 1993-09-01, Bath.

Hardisty, H., Mileham, A. R. and Shirvani, H., 1993. A model of the electrochemical machining process. In: Proc 2nd International Conference on Computational Modelling of Free and Moving Boundary Problems, 1993-06-01, Milan.

Hardisty, H., Mileham, A. R. and Shirvani, H., 1993. A finite element model of the electrochemical machining process. In: Annals of CIRP, 1993-01-01, Paris.

McIntosh, R. I., Culley, S. J., Gest, G. B. and Mileham, A. R., 1993. An overall methodology for set-up reduction (SUR) within existing manufacturing systems. In: Bramley, A. N. and Mileham, A. R., eds. Proc 9th National Conference on Manufacturing Research - Advances in Manufacturing Technology VII, 1993-09-01, Bath.

Gest, G., Culley, S. J., McIntosh, R., Mileham, A. R. and Nolan, P. J., 1993. Method study techniques for S.U.R. In: Nolan, P. J., ed. Proc 10th Conference of the Irish Manufacturing Committee, 1993-09-01, University College Galway.

Linardakis, S. and Mileham, A. R., 1992. A CAD interpreter for prismatic components. In: Proc 8th National Conference on Manufacturing Research - Advances in Manufacturing Technology VI, 1992-09-01, Birmingham.

Scott, A. J. and Mileham, A. R., 1992. A code based process planning system for sheet metal components. In: Proc 8th National Conference on Manufacturing Research - Advances in Manufacturing Technology VI, 1992-09-01, Birmingham.

Chapman, N. A., Mileham, A. R. and McQueen, L. B., 1992. Synchronised manufacture through manufacturing systems simulation. In: Proc 8th National Conference on Manufacturing Research - Advances in Manufacturing Technology VI, 1992-09-01, Birmingham.

Zhang, Y. and Mileham, A. R., 1992. An automated generator of NC programs for rotational parts from CAD product models. In: Proc 6th ISPE/IFAC International Conference on CADCAM Robotics and Factories of the Future (CARS&FOF92), 1992-01-01, London:.

Rustom, E. A. and Mileham, A. R., 1992. Automated decision making for process planning flexible automation and information management. In: Proc 2nd International Flexible Atomation and Information Management Conference (FAIM92), 1992-01-01, Virginia USA.

Currie, C. G., Mileham, A. R., Bradford, D. T. and Miles, A. W., 1992. Conceptual cost estimating at the conceptual stage of the Design Process. In: Proc 6th ISPE/IFAC International Conference on CADCAM Robotics and Factories of the Future (CARS&FOF92, 1992-01-01, London.

Mileham, A. R., Currie, G. C., Miles, A. W. and Bradford, D. T., 1992. Conceptual cost information as an aid to the designer. In: International Operations - Crossing Boarders in Manufacturing and Service (Proc 7th Annual Conference of the OMAUK), 1992-01-01, UMIST.

Zhang, Y. and Mileham, A. R., 1991. A CAD interpreter for interfacing CAP and CAP for 2D rotational parts. In: Proc 7th National Conference on Manufacturing Research - Advances in Manufacturing Technology VI., 1991-08-01, Hatfield.

Currie, C. G., Mileham, A. R., Bradford, D. T. and Miles, A. W., 1991. Conceptual cost estimating using complexity criteria. In: Proc 7th National Conference on Manufacturing Research - Advances in Manufacturing Technology VI., 1991-08-01, Hatfield.

Owen, G. W. and Mileham, A. R., 1991. The influence of machine failure on transfer line performance. In: Proc 7th National Conference on Manufacturing Research - Advances in Manufacturing Technology VI., 1991-08-01, Hatfield.

Owen, G. W. and Mileham, A. R., 1991. The use of buffers to improve transfer line performance. In: Proc 8th National Conference on Manufacturing Research - Advances in Manufacturing Technology VI, 1992-09-01, Birmingham.

Currie, G. C., Mileham, A. R., Miles, A. W. and Bradford, D. T., 1990. Cost estimation of polymer products at the conceptual stage of design, advances in Man Tech V. In: Proc 6th National Conference on Manufacturing Research - Advances in Manufacturing Technology V., 1990-09-01, Glasgow.

Rustom, E. A. and Mileham, A. R., 1990. Feature ordering and operation sequencing for automated process planning. In: Proc 6th National Conference on Manufacturing Research - Advances in Manufacturing Technology V., 1990-09-01, Glasgow.

Rustom, E. A. and Mileham, A. R., 1990. Automatic selection of raw material in process planning. In: Proc 7th Irish Advanced Manufacturing Conference, 1990-08-01, Dublin.

Zhou, Y. and Mileham, A. R., 1990. A flexible classification and coding system. In: Proc 6th National Conference on Manufacturing Research - Advances in Manufacturing Technology V., 1990-09-01, Glasgow.

Isik, I. and Mileham, A. R., 1989. Automated feature ordering for generative process planning. In: Proc 10th International Conference on Production Research, 1989-08-01.

Zhang, Y. and Mileham, A. R., 1989. A rule based expert system for process planning. In: Proc 5th National Conference on Manufacturing Research - Advances in Manufacturing Technology IV, 1989-01-01, Huddersfield Poly.

Rustom, E. and Mileham, A. R., 1989. The development of a generative CAPP system for prismatic components. In: Proc 5th National Conference on Manufacturing Research - Advances in Manufacturing Technology IV, 1989-01-01, Huddersfield Poly.

Ozkirim, M. and Mileham, A. R., 1988. An approach to a flexible group technology system using some heuristic procedures. In: Proc 5th National Conference on Manufacturing Research - Advances in Manufacturing Technology IV, 1989-01-01, Huddersfield Poly.

Masuku, E. S. and Mileham, A. R., 1988. Automatic moulding orientation heuristics in mould design for injection moulding. In: Proc 3rd International conference onManufacturing Processes, Systema and Operations Management in Less Industrialised Regions, 1998-04-01, Zimbabwe.

Mileham, A. R. and Isik, I., 1987. The design of a generative CAPP system for turned parts. In: Proc 4th National Conference on Manufacturing Research - Advances in Manufacturing Technology III, 1987-01-01, Sheffield Polytechnic.

Semple, R., Corderoy, M. P. and Mileham, A. R., 1987. The design of a robot tool changing system. In: Proc 4th National Conference on Manufacturing Research - Advances in Manufacturing Technology III, 1987-01-01, Sheffield Polytechnic.

Mileham, A. R., 1987. Visually interactive schedulling. In: Proc 2nd Annual Operations Management Association Conference, 1987-01-01, University of Nottingham.

Mileham, A. R. and Harvey, S. J., 1985. The avoidance of macrodefects in ECM. In: Proc 1st National Conference on Manufacturing Research - Advances in Manufacturing Technology I, 1985-09-01, University of Nottingham.

Mileham, A. R., Harvey, S. J. and Stout, K. J., 1985. The characterisation of ECM surfaces. In: Proceedings of the 3rd International Conference on Metrology and Properties of Engineering Surfaces, 1985-04-01, Teeside Polytechnic.

This list was generated on Fri Aug 29 09:35:18 2014 IST.