Research

Items by Graves, Andrew

Up a level
Export as [feed] RSS 1.0 [feed] Atom [feed] RSS 2.0
Group by: Item Type | Date | No Grouping
Number of items: 28.

Graves, A. P., 2010. Defence procurement in crisis : A call for leadership. RUSI Defence Systems, 12 (3), pp. 8-11.

Naudé, P., Henneberg, S. C., Mouzas, S., Ramos, C., Graves, A. and Crute, V., 2009. Seeking for solutions within a project setting. Journal of Business Market Management, 3 (3), pp. 151-170.

Parry, G. and Graves, A., 2008. The importance of knowledge management for ERP systems. International Journal of Logistics: Research and Applications, 11 (6), pp. 427-441.

Stone, G., Howard, M., Miemczyk, J. and Graves, A., 2008. Collaborative ICT ventures and the implementation of responsive automotive supply networks. International Journal of Automotive Technology and Management, 8 (3), pp. 239-253.

Parry, G. and Graves, A., eds., 2008. Build to Order : The Road to the 5-Day Car. London, U. K.: Springer-Verlag.

, 2008. Introduction and overview. In: Parry, G., Graves, A., Parry, G. and Graves, A. P., eds. Build to Order. London, U. K.: Springer, pp. 1-10.

Lee, S., Parry, G. and Graves, A., 2008. Managing knowledge resources for sustainable competitive advantage. In: COBRA 2008 - Construction and Building Research Conference of the Royal Institution of Chartered Surveyors. .

Stone, G. M., Graves, A. and Crute, V. C., 2008. Managing the transition to the "5-day car" in Europe. In: Parry, G. and Graves, A., eds. Build To Order. London: Springer-Verlag, pp. 383-399.

Parry, G. C. and Graves, A. P., 2008. The road to the 5-day car. In: Build To Order. London: Springer-Verlag, pp. 403-407.

Graves, A., 2007. The UK industrial manufacturing base. RUSI Defence Systems, 10 (1), pp. 58-63.

Miemczyk, J. and Graves, A., 2007. Managing end-of-life vehicle networks : a longitudinal case of the UK. International Journal of Automotive Technology and Management, 7 (4), pp. 356-370.

Stone, G., Parry, G., Graves, A. and Esser, R., 2007. Requirement for a sea-change in European car production. In: Rabe, M. and Mihok, P., eds. New Technologies for the intelligent Design and Operation of Manufacturing Networks. Stuttgart, Germany: Fraunhofer IRB Verlag.

Ward, Y. and Graves, A., 2007. Through-life management: the provision of total customer solutions in the aerospace industry. International Journal of Services Technology and Management (IJSTM), 8 (6), pp. 455-477.

Howard, M., Miemczyk, J. and Graves, A., 2006. Automotive supplier parks : an imperative for build-to-order? Journal of Purchasing and Supply Management, 12 (2), pp. 91-104.

Stone, G., Miemczyk, J., Howard, M., Graves, A. and Esser, R., 2006. Establishing build to order in the European automotive sector. In: 12th IFAC Symposium on Information Control Problems in Manufacturing, INCOM 2006, and Associated Industrial Meetings: EMM'2006, BPM'2006, JT'2006. Vol. 12. Laxenburg: IFAC Secretariat. (IFAC Proceedings)

Parry, G., James-Moore, M. and Graves, A., 2006. Outsourcing engineering commodity procurement. Supply Chain Management, 11 (5), pp. 436-443.

Parry, G., Graves, A. and James-Moore, M., 2006. The threat to core competence posed by developing closer supply chain relationships. International Journal of Logistics Research and Applications, 9 (3), pp. 295-305.

Stone, G., Parry, G. and Graves, A., 2006. Transformation of the European automotive industry : the future of lean. Journal of Financial Transformation, 18, pp. 10-15.

Howard, M., Miemczyk, J. and Graves, A., 2005. A strategic approach towards integrating automotive painting for building to order. International Journal of Automotive Technology and Management, 5 (1), pp. 1-17.

Crute, V., Ward, Y., Brown, S. and Graves, A., 2003. Implementing lean in aerospace : challenging the assumptions and understanding the challenges. Technovation, 23 (12), pp. 917-928.

Waller, B., Williams, G., Graves, A. and Howard, M., 2002. Order systems for 3DayCa : Collaborative IT for enterprise-wide optimization through build to order. In: SAE 2002 World Congress, 2002-03-04 - 2002-03-07, Detroit, MI.

Ward, Y., Jones, M. and Graves, A., 2001. A common set of metrics for improved competitiveness in aerospace. International Journal of Aerospace Management, 1 (2), pp. 131-137.

Graves, A. and Crute, V., 2001. A lean approach to change management. International Journal of Aerospace Management, 1 (2), pp. 167-177.

Holt, R. and Graves, A., 2001. Benchmarking UK government procurement in construction projects. Measuring Business Excellence, 5 (4), pp. 13-21.

Ward, Y. and Graves, A., 2001. Lean performance measurement for aerospace : if you aren't keeping score, then you're only practising! International Journal of Aerospace Management, 1 (1), pp. 85-96.

Howard, M. and Graves, A., 2001. Painting the 3DayCar : developing a new approach to automotive coatings and lean manufacture. In: Automotive and Transportation Technology Congress and Exhibition, 2001-10-01 - 2001-10-03, Barcelona.

James-Moore, M., Broughton, T., Womersley, M., Deasley, D., Williamson, A., Gindy, N., Harrison, A. and Graves, A., 2001. The development of the UK lean aerospace initiative. International Journal of Aerospace Management, 1 (2), pp. 131-137.

Howard, M., Young, K. and Graves, A., 2001. Towards the 3Daycar : vehicle design and its impact on rapid build-to-order. International Journal of Vehicle Design (IJVD), 26 (5), pp. 445-468.

This list was generated on Fri Aug 22 20:35:46 2014 IST.