Research

Items by Owen, Geraint

Up a level
Export as [feed] RSS 1.0 [feed] Atom [feed] RSS 2.0
Group by: Item Type | Date | No Grouping
Jump to: 2013 | 2011 | 2010 | 2009 | 2008 | 2007 | 2006 | 2005 | 2004 | 2003 | 2002 | 2001 | 2000 | 1999 | 1998 | 1997 | 1996 | 1995 | 1993 | 1991
Number of items: 92.

2013

Barrie, J. and Owen, G., 2013. Exploring featherweight industry PLM solutions for academic use. In: Kovacevic, A., Lawlor, J. and Parkinson, B., eds. Proceedings of the 15th International Conference on Engineering and Product Design Education. Design Society, pp. 480-486.

2011

Owen, G. W., Matthews, J., McIntosh, R. I. and Culley, S. J., 2011. Design for Changeover (DFC): enabling flexible and highly responsive manufacturing. In: Fogliatto, F. and da Silveira, G., eds. Mass Customization –Engineering and Managing Global Operations. Vol. III. Springer, pp. 247-273. (Springer Series in Advanced Manufacturing)

2010

Barker, M., Drew, B., Darling, J., Edge, K. A. and Owen, G. W., 2010. Steady-state steering of a tilting three-wheeled vehicle. Vehicle System Dynamics, 48 (7), pp. 815-830.

Wang, Q., Mileham, A., Owen, G. and Jacquin, R., 2010. Analysis of matrix assembly systems. In: Jiang, Y. and Wang, L., eds. ICMS2010: Proceedings of the Third International Conference on Modelling and Simulation, Vol 6 - Modelling & Simulation Industrial Engineering & Management. Vol. 6. World Academic Union, pp. 13-18.

Wang, Q., Sowden, M., Mileham, A. and Owen, G., 2010. Modeling human performance using learning curves. In: Jiang, Y. and Bao, H., eds. ICMS2010: Proceedings of the Third International Conference on Modelling and Simulation, Vol 4 - Modelling and Simulation in Biology, Ecology & Environment. Vol. 4. Liverpool: World Academic Union, pp. 1-7.

Wang, Q., Lassalle, S., Mileham, A. R. and Owen, G. R., 2010. Analysis of production loss on a linear walking worker line. Proceedings of World Academy of Science, Engineering and Technology, 65, pp. 758-762.

2009

Owen, G., 2009. Motorsport Energy Usage: Competition vs Manufacture. In: WorldFirst Motorsport Conference, 2009-09-14 - 2009-09-15, Warwick.

Guo, Y. W., Li, W. D., Mileham, A. R. and Owen, G. W., 2009. Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach. International Journal of Production Research, 47 (14), pp. 3775-3796.

Wang, Q., Lassalle, S., Mileham, A. R. and Owen, G. W., 2009. Analysis of a linear walking worker line using a combination of computer simulation and mathematical modeling approaches. Journal of Manufacturing Systems, 28 (2-3), pp. 64-70.

Maisano, D. A., Jamshidi, J., Franceschini, F., Maropoulos, P. G., Mastrogiacomo, L., Mileham, A. R. and Owen, G. W., 2009. A comparison of two distributed large-volume measurement systems: the mobile spatial co-ordinate measuring system and the indoor global positioning system. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 223 (5), pp. 511-521.

Guo, Y. W., Mileham, A. R., Owen, G. W., Maropoulos, P. G. and Li, W. D., 2009. Operation sequencing optimization for five-axis prismatic parts using a particle swarm optimization approach. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 223 (5), pp. 485-497.

Guo, Y. W., Liu, W. D., Mileham, A. R. and Owen, G. W., 2009. Applications of particle swarm optimisation in integrated process planning and scheduling. Robotics and Computer-Integrated Manufacturing, 25 (2), pp. 280-288.

2008

Guo, Y., Owen, G., Liu, W., Maropoulos, P. and Mileham, A., 2008. Application of Particle Swarm Optimisation Approach to Integrate Process Planning and Scheduling. In: Proceedings of 5th International Conference on Digital Enterprise Technology, 2008-10-22 - 2008-10-24, Nantes.

Wang, Z., Maropoulos, P., Jamshidi, J., Owen, G. and Mileham, A., 2008. Experimental Deployment of the Indoor GPS Large Volume Metrology System in a Large Scale Production Facility. In: 3rd International Conference on Manufacturing Engineering, 2008-10-01 - 2008-10-03, Kallithea of Chalkidiki.

Wang, Q., Manickam, H., Mileham, A. and Owen, G., 2008. An investigation of a semi-automated automotive engine assembly line incorporating walking workers. In: 2nd CIRP Conference on Assembly Technologies and Systems, 2008-09-21 - 2008-09-23, Toronto.

Maisano, D. A., Jamshidi, J., Franceschini, F., Maropoulos, P., Mastrogiacomo, L., Mileham, A. and Owen, G. W., 2008. Indoor GPS: system functionality and initial performance evaluation. International Journal of Manufacturing Research, 3 (3), pp. 335-349.

2007

Guo, Y., Mileham, A., Owen, G. and Maropoulos, P., 2007. Operation Sequencing Optimisation Using a Particle Swarm Optimisation Approach for 5 Axis Prismatic Part. In: 4th International Conference on Digital Enterprise Technology, 2007-09-19 - 2007-09-21, Bath.

Jamshidi, J., Owen, G., Maropoulos, P. and Mileham, A., 2007. Reverse Engineering of a Mechanical Component - A Case Study of F1 Student Car. In: 4th International Conference on Digital Enterprise Technology, 2007-09-19 - 2007-09-21, Bath.

Wang, Q., Pan, L., Mileham, A. R., Newnes, L. B., Owen, G. W. and Chatwin, C. R., 2007. Modelling Randomness of a manual assembly system with walking workers. International Journal of Industrial and Systems Engineering, 2, 195--210.

Wang, Q., Lassalle, S., Mileham, A. R. and Owen, G. W., 2007. A changeable reconfigurable and agile assembly system using walking workers. In: Proceedings of IASTED Asian Conf on Modelling and Simulation, 2007-01-01, Beijing.

Maisano, D. A., Jamshidi, J., Franceschini, F., Maropoulos, P. G., Mastrogiacomo, L. A., Mileham, A. R. and Owen, G. W., 2007. A review of two multistation large volume measuring instruments: MScMS AND iGPS. In: 4th International Conference on Digital Enterprise Technology, 2007-09-19 - 2007-09-21, Bath.

Lassalle, S., Wang, Q., Owen, G. W. and Mileham, A. R., 2007. A study in-process waiting time on a linear walking worker assembly line. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 221 (12), pp. 1763-1770.

Wang, Q., Lassalle, S., Mileham, A. R. and Owen, G. W., 2007. Analysis and optimisation of a linear walking worker line using a combination of computer simulation and mathematical modelling approaches. International Journal of Production Research

Guo, Y. W., Mileham, A. R., Owen, G. W. and Li, W. D., 2007. Applications of particle swarm optimisationin integrated process planning and scheduling. International Journal of Robotics and Computer Integrated Manufacturing

McIntosh, R., Owen, G., Culley, S. and Mileham, T., 2007. Changeover improvement: Reinterpreting Shingo's "SMED" methodology. IEEE Transactions on Engineering Management, 54 (1), pp. 98-111.

Wang, Q., Owen, G. W. and Mileham, A. R., 2007. Determining numbers of workstations and operators for a linear walking-worker assembly line. International Journal of Computer Integrated Manufacturing, 20 (1), pp. 1-10.

Owen, G. W., Culley, S. J., Reik, M., McIntosh, R. I. and Mileham, A. R., 2007. Using differing classification methodologies to identify a full compliment of potential changeover improvement opportunities. In: Proc 14th ISPE Conf on Concurrent Engineering CE2007 (Complex Systems Concurrent Engineering, 2007-01-01, Sao-Paulo Brazil.

Jamshidi, J., Owen, G. W., Maropoulos, P. G. and Mileham, A. R., 2007. Variable volume metrology with multiple scale scanners. In: Proc 2nd International Conference on Changeable, Agile, Reconfigurable and Virtual Production (CARV2007), 2007-01-01, Toronto Canada.

2006

Guo, Y. W., Mileham, A. R., Owen, G. W. and Li, W. D., 2006. Operation sequencing optimization using a particle swarm optimization approach. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 220 (12), pp. 1945-1958.

Drew, B., Barker, M., Edge, K., Darling, J. and Owen, G. W., 2006. Experimental evaluation of a hydraulically actuated tilt system for a narrow track three-wheeled vehicle. In: 2006 ASME International Mechanical Engineering Congress and Exposition, IMECE2006, 2006-11-05 - 2006-11-10, Chicargo.

Wang, Q., Liow, D. C. Y., Pan, L., Mileham, A. R., Owen, G. W. and Shin, I. J., 2006. Modelling and simulation of human performance within a walking worker assembly line. In: Proc 1st CIRP International Seminar on Assembly Systems, 2006-11-01, Germany.

Reik, M. P., McIntosh, R. I., Culley, S. J., Mileham, A. R. and Owen, G. W., 2006. A formal design for changeover methodology. Part 1: theory and background. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 220 (8), pp. 1225-1235.

Jamshidi, J., Mileham, A. R. and Owen, G. W., 2006. A CAD modelling system Automation for Reverse Engineering Applications. In: Cunha, P. F. and Maropoulos, P. G., eds. Digital Enterprise Technology, 2006-01-01, Setubal Portugal.

Reik, M. P., McIntosh, R. I., Owen, G. W., Culley, S. J. and Mileham, A. R., 2006. A formal design for changeover (DFC) methodology. Part 1 - Theory and background. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 220 (No 8), pp. 1225-1236.

Reik, M. P., McIntosh, R. I., Owen, G. W., Culley, S. J. and Mileham, A. R., 2006. A formal design for changeover (DFC) methodology. Part 2 - Methodology and case study. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 220 (No 8), pp. 1237-1248.

Reik, M. P., McIntosh, R. I., Culley, S. J., Mileham, A. R. and Owen, G. W., 2006. A formal design for changeover methodology. Part 2: Methodology and case study. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 220 (8), pp. 1237-1247.

Jamshidi, J., Owen, G. W. and Mileham, A. R., 2006. A new data fusion method for scanned models. Journal of Computing and Information Science in Engineering, 6 (4), pp. 340-348.

Jamshidi, J., Mileham, A. R. and Owen, G. W., 2006. A proposed data-cloud reduction method forr laser scanned and CMM data integration. Proceedings of the 4th International Conference on Manufacturing Research (ICMR2006)

Drew, B., Barker, M., Edge, K. A., Darling, J. and Owen, G. W., 2006. Actuated Tilt System for a Narrow Track Three Wheeled Vehicle. In: ASME International Mechanical Engineering Congress and Exposition, 2006-11-05 - 2006-11-10, Chicago, IL..

Wang, Q., Mileham, A. R., Owen, G. W. and Chatwin, C. R., 2006. An integrated investigation into a communication network for a PCBA system. In: Proc IEEE International Conference on Robotics and Biomimetics, 2006-01-01, Kunming PRC.

Reik, M. P., McIntosh, R. I., Mileham, A. R., Owen, G. W. and Culley, S. J., 2006. Design for Changeover (DFC). In: Blecker, T. and Friedrich, G., eds. Mass Customisation - Challenges and Solutions. New York: Springer, pp. 111-136. (International series in operations research & management science)

Reik, M. P., Mileham, A. R., Culley, S. J., McIntosh, R. I. and Owen, G. W., 2006. Design for Changeover (DFC); Integrated product and process design for mass-customized, flexible manufacture. In: Proc 2006 International Forum on DFMA, 2006-01-01, RI USA.

Reik, M. P., McIntosh, R. I., Owen, G. W., Mileham, A. R. and Culley, S. J., 2006. Design for changeover (DFC): Enabling the design of highly flexible, highly responsive manufacturing processes. In: Blecker, T. and Friedrich, G., eds. Mass Customization: Challenges and Solutions - International Mass Customization Meeting. Vol. 87. Springer, pp. 111-136. (International Series in Operations Research & Management Science)

Jamshidi, J., Mileham, A. R. and Owen, G. W., 2006. Dimensional tolerance approximations for reverse engineering applications. In: Proc 9th International Design Conference (Design 2006), 2006-01-01, University of Dubrovnik.

Jamshidi, J., Mileham, A. R. and Owen, G. W., 2006. High accuracy laser scanned view registration method for reverse engineering using a CMM generated CAD model. In: Proc International ASME Design Engineering Technical Conference & Computers and Information in Engineering Conference (IDETC/CIE2006), 2006-01-01, Philadelphia USA.

Wang, Q., Pan, L., Mileham, A. R., Owen, G. W., Newnes, L. B. and Chatwin, C. R., 2006. Modelling randomness of a manual assembly system with walking workers. International Journal of Industrial and Systems Engineering, 2 (2), pp. 195-210.

Jamshidi, J., Mileham, A. R. and Owen, G. W., 2006. Rapid and accurate data integration method for Reverse Engineering Applications. In: Proc 6th International Conference on Indegrated Design and Manufacturing in Mechanical Engineering (IDMME2006), 2006-05-01, University of Grenoble.

2005

Wang, Q., Owen, G. W. and Mileham, A. R., 2005. Comparison between fixed- and walking-worker assembly lines. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 219 (11), pp. 845-848.

Jamshidi, J., Mileham, A. R. and Owen, G. W., 2005. A laser scanning registration technique for reverse engineering applications. In: Proc 3rd International Conference on Manufacturing Research (ICMR2005), 2005-09-01, Cranfield University.

Drew, B., Edge, K. A., Barker, M., Darling, J., Owen, G. W. and Johannsen, H., 2005. System development for hydraulic tilt actuation of a narrow vehicle. In: 9th Scandinavian International Conferenec on Fluid Power, 2005-06-01.

Wang, Q., Owen, G. W. and Mileham, A. R., 2005. Assessing the effect of work time variations for a linear walking-fitter assembly line. In: Proc 3rd International Conference on Manufacturing Research (ICMR2005), 2005-09-01, Cranfield University.

Reik, M. P., McIntosh, R. I., Owen, G. W., Mileham, A. R. and Culley, S. J., 2005. Design for changeover: enabling the design of highly flexible, highly responsive manufacturing processes. In: Proc of the International Mass Customisation Meeting 2005 (IMCM05), 2005-01-01, Klagenfurt.

Masuku, E. S., Bramley, A. N., Mileham, A. R. and Owen, G. W., 2005. Incremental sheet metal forming : a die-less rapid prototyping process for sheetmetal. In: Bramley, A. N., Brissaud, D., Coutellier, D. and McMahon, C., eds. Advances in Integrated Design and Manufacturing in Mechanical Engineering. Dordrecht, The Netherlands: Springer, pp. 305-314.

Qin, Q., Masuku, E. S., Bramley, A. N., Mileham, A. R. and Owen, G. W., 2005. Incremental sheet-metal forming simulation and accuracy. In: Proc ICTP 2005, 2005-01-01, Verona.

Drew, B., Edge, K. A., Barker, M., Owen, G. W. and Johanssen, H., 2005. Scandinavian International Conference on Fluid Power, SICFP'05. In: Scandinavian International Conference on Fluid Power, SICFP'05, 2005-01-01, Linköping.

Moulton, A., Grosjean, J. and Owen, G. W., 2005. The Moulton Formulae and Methods: Directly Useable for Calculations in Mechanical Engineering. London UK: Professional Engineering Publications.

Reik, M. P., McIntosh, R. I., Owen, G. W., Mileham, A. R. and Culley, S. J., 2005. The development of a systematic design for changeover methodology (205.44). In: Proc 15th ICED05, 2005-01-01, Melbourne.

2004

Reik, M. P., Culley, S. J., Owen, G. W., Mileham, A. R. and McIntosh, R. I., 2004. A novel product performance driven catergorisation of DFX methodologies. In: Proc 2ndInternational Conference on Manufacturing Research (ICMR2004), 2004-01-01, Sheffield Hallam University.

Lacarac, V., Smith, D., Tierney, M., Chang, C. C., Bramley, A. N., McMahon, C., Culley, S. J., Dekoninck, E. A., Medland, A. J., Mileham, A. R., Newnes, L. B. and Owen, G. W., 2004. Creation of residual stresses during forging and heat treatment. In: 5th International Conference on Integrated Design and Manufacturing in Mechanical Engineering, 2004-04-01.

Culley, S. J., Mileham, A. R., Owen, G. W. and McIntosh, R. I., 2004. Design for changeover and sustainability. In: International Forum on DFMA: "Cost effective design solutions for product lifecycle management", 2004-06-22 - 2004-06-23, Newport, RI.

Masuku, E. S., Bramley, A. N., Mileham, A. R. and Owen, G. W., 2004. Incremental sheetmetal forming : a die-less rapid prototyping process for sheetmetal. In: Proc IDMME2004 and Advances in Integrated Design and Manufacture in Mechanical Engineering, 2004-01-01, University of Bath.

Bramley, A. N., Culley, S. J., Dekoninck, E. A., McMahon, C. A., Medland, A. J., Mileham, A. R., Newnes, L. B. and Owen, G. W., 2004. Proceedings of the IDMME 2004 Conference. Bath: University of Bath. (Proc IDMME (Abstracts and CD))

Mileham, A. R., Culley, S. J., Owen, G. W., Newnes, L. B., Giess, M. D. and Bramley, A. N., 2004. The impact of run-up in ensuring rapid changeover. CIRP Annals - Manufacturing Technology, 53 (1), pp. 407-410.

2003

Culley, S. J., Owen, G. W., Mileham, A. R. and McIntosh, R. I., 2003. Sustaining changeover improvement. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 217 (10), pp. 1455-1470.

Fitton, S., Mileham, A. R. and Owen, G. R., 2003. The design of flexible assembly lines. In: Proc 1st National Conference on Manufacturing Research ICMR2003 - Advances in Manufacturing ResearchXVII, 2003-09-01, University of Strathclyde.

2002

Eldridge, C., Mileham, A. R., McIntosh, R. I., Culley, S. J., Owen, G. W. and Newnes, L. B., 2002. Rapid changeovers - the run up problem. In: Conference on CADCAM Robotics and Factories of the Future (CARS&FOF2002), 2002-01-01, Porto. INESC Porto (Manufacturing Systems Dept) Portugal.

Mileham, A. R., Culley, S. J., McIntosh, R. I. and Owen, G. W., 2002. The development of a design for changeover methodology. In: International Forum on DFMA, 2002-01-01, Newport, RI.

2001

McIntosh, R. I., Culley, S. J., Mileham, A. R. and Owen, G. W., 2001. Changeover improvement: A maintenance perspective. International Journal of Production Economics, 73 (2), pp. 153-163.

Lee, J. R., Mileham, A. R. and Owen, G. W., 2001. Development of principles for ergonomic arena seating design. In: Proc 17th National Conference on Manufacturing Research - Advances in Manufacturing Technology XV, 2001-01-01, University of Cardiff.

McIntosh, R. I., Culley, S. J., Mileham, A. R. and Owen, G. W., 2001. Improving Changeover Performance- A strategy for becoming a lean and responsive manufacture. Oxford: Butterworth-Heinemann.

Eldridge, C., Mileham, A. R., Culley, S. J., Owen, G. W. and Newnes, L. B., 2001. Run up: the hidden cost of changeover. In: IMechE seminar on Rapid Changeovers of Food Production Lines, 2001-01-01.

McIntosh, R. I., Mileham, A. R., Culley, S. J. and Owen, G. W., 2001. Sustaining improvements in changeover performance. In: IMechE seminar on Rapid Changeovers of Food Production Lines, 2001-01-01.

2000

Daniel, J. A., Wills, S. P., Darling, J., Mileham, A. R. and Owen, G. W., 2000. Design for assembly in the caravan industry - A case study. In: 16th International Conference on Manufacturing Research, 2000-10-01, University of East London.

Gest, G. B., Culley, S. J., McIntosh, R. I., Mileham, A. R. and Owen, G. W., 2000. Classification methodologies for set-up-reduction techniques within industry. In: Proc 4th International Factory 2000 Conference, 2000-01-01, University of York.

Mileham, A. R., Jeffries, A. W., Owen, G. W. and Pellegrin, F., 2000. The design and performance of walking fitter assembly lines. In: Proc 16th International Conference on CADCAM Robotics and Factories of the Future (CARS&FOF2000), 2000-01-01, University of the West Indies, Trinidad.

Mileham, A. R., Owen, G. W. and Jeffries, A. W., 2000. The introduction of advanced technology into a micro-company - a case study. In: Fox, T. B. and Steeple, D., eds. Proc 3rd International SMESME Conference, 2000-01-01, Coventry.

1999

Bramley, A. N., Mileham, A. R., Newnes, L. B. and Owen, G. W., eds., 1999. Advances in manufacturing technology XIII. London: Wiley-Blackwell.

Kwon, H. H., Bramley, A. N., Mileham, A. R., Newnes, L. B. and Owen, G. W., 1999. Die design for the cold forging of spur gears. In: Advances in Manufacturing Technology XIII, Proceedings of the 15th National Conference on Manufacturing Research, 1999-01-01, Bury St Edmunds, Suffolk.

Chang, C. C., Bramley, A. N., Mileham, A. R., Newnes, L. B. and Owen, G. W., 1999. Forging preform design using reverse simulation for plain strain application. In: Bramley, A. N., Mileham, A. R., Newnes, L. B. and Owen, G. W., eds. Advances in Manufacturing Technology XIII, Proceedings of the 15th National Conference on Manufacturing Research, 1999-01-01, Bury St Edmunds, Suffolk.

Crookes, J. M., Mynors, D. J., Bramley, A. N., Garner, D. G., Hankers, J. B., Haseldine, J., Delday, T. D., Mileham, A. R., Newnes, L. B. and Owen, G. W., 1999. Moving to right first time through the application of forging simulation - an industrial case study. In: Mileham, A. R., Newnes, L. B. and Owen, G. W., eds. Advances in Manufacturing Technology XIII, Proceedings of the 15th National Conference on Manufacturing Research, 1999-01-01, Bury St Edmunds, Suffolk.

1998

Mileham, A. R., Culley, S. J., Owen, G. W. and McIntosh, R. I., 1998. Rapid changeovers - a pre-requisite to manufacturing responsiveness. In: Proc IEE Workshop on Responsiveness in Manufacture, 1998-02-23, Savoy Place London.

1997

Culley, S. J., Owen, G. W. and Riitahuhta, A., 1997. Drivers and the constraints to innovation - an overview.

Goodship, A. E., Cunningham, J. L., Walker, P., Organov, V., Darling, J., Miles, A. W. and Owen, G. W., 1997. Bone loss during long term space flight is prevented by the application of a short term impulsive mechanical stimulus. In: 12th Man in Space Symposium, 1997-06-01, Washington.

Culley, S. J., Mileham, A. R., Owen, G. W., McIntosh, R. I. and Gest, G. B., 1997. Rapid changeover of dies and molds. In: Proc. Int. Conf. on the Design & Production of Dies & Molds, 1997-06-01, Istanbul.

1996

Owen, G., Culley, S. and Mileham, T., 1996. Quick fitting nut. F16B37/08-GB2296060 (A), 19 June 1996.

1995

Mileham, A. R., Culley, S. J., Owen, G. W. and McIntosh, R. I., 1995. Design for changeover - a pre-requisite for lean manufacture. In: Proc 28th International Symposium of the Automotive Technology and Automation (ISATA) on Lean/Agile Manufacturing in the Automotive Industries, 1995-09-01, Stuttgart.

McIntosh, R., Culley, S. J., Gest, G. B., Mileham, A. R. and Owen, G. W., 1995. The role of rapid changeover in adapting manufacturing systems for Lean Manufacture. In: Proc 5th International European Automobile EngineersC-operation Congress (EAEC) -Lean product Development and Manufacture, 1995-05-01, Strasbourg.

Owen, G. W., McIntosh, R. I., Mileham, A. R., Culley, S. J. and Gest, G., 1995. Manufacturing flexibility - A case for excess capacity. In: Proc 11th National Conference on Manufacturing Research - Advances in Manufacturing Technology iX, 1995-09-01, DeMontfort University.

Fernihough, A. M., Owen, G. W., Mileham, A. R. and Culley, S. J., 1995. The development of a technique for the evaluation of business strategies. In: Proc Concurrent EngineeringConference (CE95), 1995-01-01, Virginia USA.

1993

Owen, G. R. and Mileham, A. R., 1993. A method for buffering transfer lines to maximise output. In: Proc 10th Conference of the Irish Manufacturing Committee, 1993-09-01, University College Galway.

1991

Owen, G. W. and Mileham, A. R., 1991. The influence of machine failure on transfer line performance. In: Proc 7th National Conference on Manufacturing Research - Advances in Manufacturing Technology VI., 1991-08-01, Hatfield.

Owen, G. W. and Mileham, A. R., 1991. The use of buffers to improve transfer line performance. In: Proc 8th National Conference on Manufacturing Research - Advances in Manufacturing Technology VI, 1992-09-01, Birmingham.

This list was generated on Thu Jul 31 22:46:46 2014 IST.